Post-Training Scaling: How Open Models Can Catch Up with Leading Models
Recent evaluation results suggest that some open models can now match leading open models and approach certain closed-source flagships in selected tasks. This article examines the engineering trend behind that progress: scaling post-training rather than repeatedly expanding the pre-training base model. It compares the two approaches, explains how scaling priorities have shifted, discusses total and active parameters in Mixture-of-Experts models, and outlines practical guidance for building post-training environments and evaluating total cost of ownership.
One Evaluation Result Is Not the Whole Story
Recently, some open large language models have achieved scores comparable to leading open models on selected international evaluations, while approaching several closed-source flagship models. This article does not cite specific model names, evaluation versions, or scores because those details cannot be independently verified here. Instead, it focuses on the underlying technical trend. The analysis is based on public research and engineering experience rather than any single set of scores.
Two Improvement Paths Converge
Path One: Scaling Parameter Counts During Pre-Training
The idea behind this approach is straightforward: build a Mixture-of-Experts (MoE) foundation model with a parameter count reaching the trillion scale, using a large number of expert networks to increase knowledge capacity.
In public discussions, the pre-training cost of such models is often estimated at tens of millions of US dollars, with training taking months. These figures are industry estimates rather than audited results, but the overall direction is clear. Each major capability upgrade may require retraining the entire foundation model, creating a high barrier for teams with limited computing resources.
Path Two: Unlocking Existing Capabilities Through Post-Training
The second approach keeps the foundation model unchanged and improves performance through post-training. Common methods include:
- Expanding the number of long-horizon task environments, allowing the model to explore and make mistakes across more and longer task sequences;
- Increasing environment diversity to cover coding, mathematics, multi-turn tool use, long-document reasoning, and other scenarios;
- Scaling reinforcement learning by increasing the number of training steps and batches, enabling continuous optimization of decision-making capabilities.
Post-training iterations are generally shorter than pre-training cycles. The exact timeline depends on team size, available compute, and the maturity of the task environments, so there is no universal figure.
Comparing the Two Approaches
| Dimension | Pre-Training Scaling | Post-Training Scaling |
|---|---|---|
| Main investment | Data, large-scale compute, and foundation-model training | Task environments, reward design, and reinforcement-learning compute |
| Typical iteration cycle | Usually measured in months | Depends on environment maturity and is generally shorter than pre-training |
| Primary risks | Training failure and high retraining costs | Reward bias and environment overfitting |
| Best suited for | Teams with long-term compute reserves | Teams with an existing foundation model that can build automatically verifiable environments |
| Evaluation method | Benchmark evaluations and downstream task assessments | Task-level A/B testing and production metrics |
Post-training scaling builds on an existing pre-trained foundation model. In practice, the two approaches are complementary rather than mutually exclusive.
Scaling Laws from an Engineering Perspective: Three Shifts in Focus
Scaling-law discussions are often presented as a chronological sequence of research conclusions. These conclusions should not be treated as formal theoretical stages. The following three shifts simply summarize how engineering priorities have changed and why post-training has received more attention.
First Shift: Prioritizing Parameter Scale
Early research suggested that, as compute increased, parameter counts should grow faster than the amount of training data. This view contributed to the development of a generation of models with hundreds of billions of parameters.
Second Shift: Balancing Parameters and Data
Later research proposed that, under a fixed compute budget, there is an optimal relationship between parameter count and the number of training tokens. A commonly cited rule of thumb from the Chinchilla results is approximately 20 tokens per parameter.
This figure must be applied within its original assumptions. The model family and architecture are relatively stable, the goal is to maximize performance under a fixed training-compute budget, and data quality remains consistent. Once data quality, architecture, or training details change, the optimal ratio can also shift. The number 20 should therefore be treated as a starting point, not a universal constant.
Third Shift: Including Inference Cost in the Objective
Earlier conclusions mainly counted training costs: train the model once and evaluate it once. In real-world applications, however, a model may be called many times every day. Inference costs can eventually exceed training costs and become the largest component of total cost of ownership.
Once inference cost is included in the optimization target, a smaller model with longer training may be preferable. Savings on each inference can accumulate across a large number of calls. This perspective helps explain the strategy behind some recent “small but strong” open models, although it represents a trade-off and does not apply to every use case.
Total Parameters and Active Parameters in MoE Models
The roles of total parameters and active parameters in MoE models are often conflated. A useful general framework is as follows:
- Total parameters primarily affect how much knowledge the model can store, including facts, long-tail knowledge, and domain-specific details;
- Active parameters primarily affect the depth of reasoning that can be performed during a single forward pass, including the length of causal chains and the complexity of multi-step reasoning.
This framework assumes that the routing mechanism is stable, the data distribution is appropriate, and the training-token budget is sufficient. When these conditions are not met, the roles of total and active parameters may become intertwined and difficult to isolate.
With total training compute held constant, adding more experts distributes compute across a larger number of networks. Each expert then receives fewer training examples, which may reduce capability. Increasing the proportion of experts activated per token will generally help reasoning performance, but this must be confirmed through A/B evaluation, and inference costs will also increase.
One explanation for the effectiveness of post-training is that extensive trial and error during reinforcement learning mainly refines existing activation pathways. It can make reasoning chains more stable without necessarily expanding the model’s knowledge capacity. This explanation is plausible, but it remains a hypothesis that should be tested through ablation studies.
Three Engineering Implications
1. Build a Control-Variable Checklist Instead of Betting on One Variable
Model capability can be improved through multiple adjustable dimensions, including data quality, the active-parameter ratio, post-training compute allocation, and inference-time compute such as reasoning-chain length.
Teams should first use small-scale experiments to estimate the marginal return of each control variable. The available budget can then be directed toward the option with the highest observed return.
2. Treat Environment Engineering as Infrastructure
Post-training scaling depends on large, diverse task environments with automatically verifiable rewards. During development, teams can evaluate the following areas:
- Whether task outcomes can be verified automatically;
- Whether the reward model has been calibrated and is free from systematic bias;
- Whether credit assignment is reasonable in long-horizon tasks and can identify which step caused the final result;
- Whether environment-sampling throughput can keep pace with training;
- Whether failed samples can be fed back into the next training cycle;
- Whether training data and evaluation environments are isolated to prevent test-set leakage.
Infrastructure planning should also cover elastic compute scheduling, large-scale parallel environment sampling, and monitoring and alerting for training. General-purpose container platforms and distributed-training frameworks may be candidates, but their actual costs for sampling throughput, reward verification, data isolation, and scheduling should be calculated. They should not be assumed to substantially lower the barrier by default.
3. Use Total Cost of Ownership for Model Selection
When selecting a model, benchmark scores alone are not enough. Evaluation should be broken down by task type. A recommended process is:
- Divide the business workload into specific task categories;
- Estimate the cost of each call;
