Two Tasks That Burned Through a Monthly Quota: Benchmarking Strong Planning Models

    This article examines why two extreme coding tasks—generating a 3D shooter prototype and building an OS prototype—can exhaust a monthly API budget, and argues that the real bottleneck is planning, not code generation. It splits model capability into planning and execution, proposes using a spreadsheet prototype as a verifiable, budget-friendly target, outlines what a strong planning document should contain, and shows how low-cost execution models expose planning gaps. It also covers a cost breakdown, ways to control consumption, and how to evaluate non-functional qualities such as UI aesthetics. The conclusion: invest in turning plans into documents, acceptance criteria into tests, and cost into observable metrics.

    1. The Trigger: Two Tasks Drained a Monthly Plan

    What caught the most attention in technical communities recently was not another model topping a benchmark, but two “extreme tasks” appearing at the same time. In one, an AI coding tool was used to generate a 3D shooter game prototype from scratch, with a reported single-run API cost in the hundreds of dollars. In the other, a claim was made to produce an operating system prototype within a few days. Put both tasks under the same monthly plan, and rapid quota exhaustion is almost inevitable.

    The cause is not that “the model is too expensive,” but that the shape of the task determines the consumption curve. A 3D game involves a rendering loop, an asset pipeline, physics, and input systems; any incomplete generation triggers large-scale rework. An OS prototype involves the boot flow, memory and scheduling abstractions, and system call boundaries; the verification chain is long and feedback is slow. Both share the same traits: the context window is repeatedly filled, retry rates are high, and a single session rarely converges.

    So the question worth discussing is not “can it generate everything in one shot,” but: under a limited budget, how do you gauge a model’s capability ceiling and spend money where capability differences show most clearly?

    2. Splitting Capability into Two Layers: Planning and Execution

    In engineering practice, model capability should be split into at least two layers:

    • Planning capability: requirement clarification, scope definition, module decomposition, interface contracts, data structure design, milestones and acceptance criteria, and risk identification.
    • Execution capability: writing code against agreed interfaces, adding tests, fixing defects, and doing local refactoring.

    Most teams test the two together, which leads to “the code runs but the architecture is unmaintainable,” or “the demo looks impressive but cannot evolve.” A more reasonable approach is: let a strong planning model produce only planning assets, and let a cheaper execution model implement them from the documents. This matches the cost structure of real production and exposes the real gap between models in planning quality.

    A practical division of labor:

    1. Stage A (Planning): requirements -> domain model -> module boundaries -> interface contracts -> milestones -> acceptance checklist
    2. Stage B (Execution): generate code from contracts -> unit tests -> integration tests -> defect fixes
    3. Stage C (Review): architecture review + cost retrospective -> write back into planning docs

    3. Choosing a Verifiable, Budgetable Target: A Spreadsheet Prototype

    To probe planning capability, the target must meet three conditions: high enough complexity, objective acceptance criteria, and controllable cost. A spreadsheet application prototype is an ideal choice: cell model, formula computation, dependency graph, recalculation order, formatting and styles, import and export—each can be written as a clear acceptance test case.

    Note that a full commercial spreadsheet’s codebase is over a million lines. The goal here is not to replicate every feature, but to probe planning depth with “near-complete core semantics”: formula parsing and evaluation, circular dependency detection, range-based bulk operations, undo/redo, and a minimal usable persistence format.

    4. What a Planning Document Should Look Like: Turning Inspiration into an Engineering Asset

    The value of a strong planning model lies in whether it can output an “executable document.” It should contain at least the following sections:

    1. Scope and non-scope: state clearly what will not be done, to avoid scope creep during execution.
    2. Domain model: cell coordinates, ranges, styles, formula nodes, dependency edges.
    3. Interface contracts: function signatures, inputs and outputs, error types.
    4. Recalculation strategy: topological sort, dirty-region marking, batch recalculation.
    5. Acceptance checklist: each item maps to an automatable test.
    6. Risks and fallbacks: circular dependencies, very large ranges, parsing ambiguity.

    An illustrative interface contract:

    1. class Cell: ...
    2. class Sheet: ...
    3. def parse_formula(src: str) -> Node: ...
    4. def evaluate(sheet: Sheet, cell: Cell) -> Value: ...
    5. def recalc(sheet: Sheet, dirty: set[Cell]) -> None: ...
    6. def detect_cycle(sheet: Sheet) -> list[Cell]: ...

    If the planning document can directly derive the contracts above and explain “why resolve dependencies before evaluation” and “why use dirty regions instead of full recalculation,” the planning layer has reached the essence of engineering rather than piling up a feature list.

    5. The Execution Stage: Using a Low-Cost Model to Surface Planning Flaws

    When the execution model writes code from the document, planning flaws show immediately: vague interfaces lead to duplicate implementations, untestable acceptance criteria lead to “looks correct,” and milestones without intermediate artifacts make incremental verification impossible. At this point, do not rush to switch to a stronger model; instead, go back to the planning document, fill in contracts and acceptance cases, and rerun execution. This loop is itself part of the evaluation.

    6. Cost Model: Why Two Tasks Can Drain the Quota

    Breaking consumption into three items makes it clearer:

    • Input context cost: repeatedly pasting long documents and long logs.
    • Retry cost: repeated consumption from failed generations.
    • Verification cost: testing and debugging sessions for long-chain tasks.

    Control measures include: separating planning from execution, chunking context, saving long documents as local files and retrieving them on demand, defining an “acceptable intermediate artifact” for each milestone, and using monitoring and alerts to set thresholds for abnormal consumption. Note that specific billing rules should follow the official documentation of the chosen cloud platform; this article assumes no vendor’s pricing details.

    7. Aesthetics and “Non-Functional Capability” Also Need Testing

    Beyond functional correctness, the aesthetics of generated output also affect usability: interface layout, spacing rhythm, status feedback, and the tone of error messages. You can score it via “multiple generations of the same requirement plus blind human review,” breaking aesthetics into observable dimensions (alignment, hierarchy, feedback timeliness, copy clarity) to avoid subjective arguments.

    8. Conclusion: Planning Capability Is the Dividing Line

    Two tasks draining a monthly plan remind us that the bottleneck of generative coding has shifted from “can it write” to “can it plan.” For teams, the most worthwhile investment is not longer sessions, but turning plans into documents, acceptance criteria into tests, and cost into observable metrics. When planning is solid, execution can be handed to a more economical model; when planning is vague, even the strongest execution only accelerates rework. If you need to host these documents, logs, and metrics, general-purpose categories suffice—for example, object storage for planning assets, log services and monitoring alerts to track consumption, and container platforms to run execution and test pipelines.