How an Indie Developer Manages 28 Apps with a Small-Bets Strategy
This article breaks down how an experienced full-stack engineer used a small-bets portfolio approach to ship and iterate on 28 apps while keeping a full-time job. It covers idea scoring, reusable project templates, automated build and review submission, subscription and pricing experiments, cloud operations, and the risks and limitations of the approach. The self-reported revenue and subscriber figures are treated as reference only because the currency, measurement period, and platform accounting were not disclosed.
Introduction: Treat Apps as Experiments First
Many developers want to build a hit app. This full-stack engineer, who has years of experience, wanted the same. In the past, he repeatedly polished his side projects and kept adjusting details. The result was longer and longer development cycles, few downloads after launch, and limited revenue.
Later, he adopted a “small bets” strategy: build fast, ship fast, and iterate fast. According to the author, he grew monthly revenue from less than 200 to more than 10,000 in eight months, accumulated more than 1,000 paid subscribers, and kept his full-time job. The currency, measurement period, and platform accounting were not disclosed, so the figures below should be treated as reference only. This article breaks down the engineering and business logic behind this approach and explains its applicable conditions and limitations.
1. Manage Projects Like a Portfolio
This strategy borrows from the idea of a portfolio. The traditional approach is to put all effort into one project, keep adding features, and hope to build a comprehensive product. The risk is that the project drags on for too long, and by the time it launches, market demand has already changed.
The small-bets strategy assumes that every app may fail. The developer releases a minimum viable product (MVP) at a low cost and lets market feedback determine which projects deserve further investment. When a single project fails, the loss is limited. Once an app receives initial validation, the developer concentrates resources on iterating it.
Before choosing which project to build, you can use a scoring table to screen ideas:
| Dimension | Evaluation question | Suggested weight |
|---|---|---|
| Demand frequency | Does the target user have this need every week or every day? | High |
| Competitive intensity | Is the app store already saturated with similar products? | Medium |
| Willingness to pay | Are users already paying for similar tools? | High |
| Implementation cost | Can a usable version be completed in two to four weeks? | Medium |
| Compliance risk | Does it involve sensitive areas such as healthcare, finance, or minors’ data? | Veto |
Compliance risk is set as a veto item. If an idea involves a sensitive area and the team does not have the relevant qualifications, it is dropped directly and does not enter scoring.
2. Build Reusable Project Templates
To release multiple apps quickly, you must first build a reusable project template. The template usually includes the following modules:
- Base UI framework and navigation structure
- Unified wrapper for phone-number login and third-party login
- Unified interface layer for in-app purchases and subscriptions
- Standardized analytics and crash reporting components
- Client-side logic for reading from a configuration center
After a new project is cloned from the template, only the business-layer code, visual assets, and copy need to be replaced. The author estimates that this significantly reduces foundation setup time, but the exact percentage depends on the project type. If the new app requires backend logic that differs greatly from the template, the time savings drop noticeably.
The reuse boundaries of the template must also be documented clearly. Which modules can be reused directly and which must be rewritten for each project should be listed in the template documentation. Otherwise, the template becomes harder to maintain as every project modifies it.
3. Automated Builds and Review Submission
The author mentions completing the process from idea to review submission in two hours. This speed can only be approached under specific conditions: the template is mature, the app assets, privacy policy, account, and review materials are ready, and there is no new backend logic to develop. Most projects cannot reach this speed.
An automated workflow generally includes: after code is pushed, unit tests and code lint checks are triggered, then the app is packaged, an internal beta version is uploaded, and finally it is submitted to the store for review. fastlane is a common tool. The example below assumes that a lane named beta has already been defined in the Fastfile:
# Run the beta lane defined in the Fastfile to build and upload an internal test versionfastlane beta# Upload prepared app metadata, skip screenshot upload (reuse existing screenshots), and submit for reviewfastlane deliver --skip_screenshots --submit_for_review
Before using it, confirm the following conditions:
- Pin the fastlane version and use
fastlane action deliverto verify the meaning of each parameter. - Complete certificate and signing configuration, and store them securely.
- Ensure the App Store Connect API key or account permissions are correct and grant only the necessary permissions.
- Make sure the privacy manifest and data collection disclosures match actual behavior.
- Prepare the review metadata (name, description, keywords, screenshots).
Pay attention to the --automatic_release parameter. When enabled, the app goes live automatically after approval. For versions that have not been manually confirmed, it is recommended to keep it off.
4. Monetization Design: From Paywalls to Pricing Experiments
In this strategy, monetization logic needs to be designed together with the template, not added after launch.
Subscription-first. The author’s utility apps place an ad-free experience, cloud data sync, and premium features inside a subscription. The paywall is usually placed after users have experienced the core value, not when the app first opens. Paid options can include monthly, annual, and lifetime purchase, so users with different willingness to pay all have a choice.
Pricing experiments. Backend configuration can show different prices to different user groups and record conversion rates. When running A/B tests, the sample size needs to be estimated in advance. For example, if the baseline conversion rate is 5% and you want to detect a 20% relative lift (conversion from 5% to 6%) at 95% confidence and 80% statistical power, each group needs roughly 8,000 users. With insufficient sample size, results are easily affected by random variation.
Compliance boundaries. When different users see different prices, avoid price discrimination based on sensitive personal characteristics and follow each app store’s rules on pricing and subscription display. Pricing experiments should be based on region, channel, or random grouping, and experiment records should be retained.
Failure handling. If a pricing change causes unsubscribe rates to rise, it should be possible to roll back to the original price quickly. This is the purpose of a configuration center: it allows price adjustments without waiting for a new release.
5. Cloud Operations: Control Cost and Boundaries
As the number of apps increases, maintaining servers manually becomes difficult. Common cloud capabilities include:
- Object storage: Host static assets and update packages. Pay attention to storage capacity, download traffic, and access permission configuration.
- Serverless functions: Handle backend API requests. Billing is usually related to invocation count, execution duration, and memory configuration. Cold starts add latency to the first request; for high-frequency APIs, you can consider keeping warm instances, but evaluate the extra cost.
- Cloud database: Store data for multiple apps in a unified way. Data between apps should be isolated through tenant fields or separate databases to avoid accidentally reading another app’s data.
- Logs and monitoring: Set alert thresholds for each app’s crash rate, API error rate, and API latency.
When choosing a cloud provider, base the decision on pricing, service-level agreements, and migration cost. This article does not recommend specific brands.
6. Risks and Limitations
This approach is not suitable for everyone. It has several clear limitations.
First, sample bias. The author’s results come from a specific type of utility app, and the creator has many years of full-stack experience. Newcomers who copy the process may not get the same results.
Second, maintenance burden. Twenty-eight apps mean twenty-eight sets of accounts, privacy statements, review materials, and user feedback. If an app has a problem, someone needs to respond in time; otherwise, it can hurt the overall rating of the store account.
Third, platform policy changes. App store review rules and subscription policies will change, so templates and processes need to be checked regularly.
Conclusion: Let Data Decide the Next Step
The engineer’s approach can be summarized in four points: build reusable templates, use automation to compress release time, design the monetization path early in the project, and use cloud infrastructure to control operations costs. Its core is not the number of apps itself, but that each app has clear evaluation criteria, exit conditions, and data feedback.
If you plan to try this approach, you can start with an app whose demand has already been validated, complete the template, review submission process, and subscription design, and then decide whether to expand further. Test each step with real data to judge which investments are worth keeping.