Evaluating Planning LLMs: How Two Complex Tasks Exhausted the Monthly Quota

    Evaluating complex software prototypes is shifting from direct code generation to a "plan-then-execute" approach. This article explores the capabilities of planning-oriented large language models through two high-complexity tasks: replicating a spreadsheet prototype and generating 2D game scenes via script painting. Both tasks exhausted the monthly subscription quota under controlled conditions, revealing that complex tasks consume extensive resources not just in code generation, but in planning, review, debugging, and visual iteration. We discuss the evaluation design, task breakdowns, cost control strategies, and engineering recommendations for adopting planning LLMs in real-world workflows.

    Evaluating Planning LLMs: How Two Complex Tasks Exhausted the Monthly Quota

    The evaluation of complex software prototypes is shifting from “letting the model write code directly” to “letting the model plan first, then execute.” The reason is straightforward: while one-shot generation looks impressive, real-world engineering success depends on requirement boundaries, module splitting, data contracts, acceptance criteria, and rework costs. This article focuses on two high-complexity tasks: first, replicating a demonstrable spreadsheet prototype; second, generating and beautifying 2D game scenes using script painting. Both tasks were completed under a controlled subscription quota, ultimately exhausting the monthly limit. This result itself illustrates that complex tasks consume not just code generation volume, but the comprehensive costs of planning, review, debugging, and visual iteration.

    1. Evaluation Design: Why “Plan First, Then Execute” is Essential

    The value of a planning LLM lies not in how much code it outputs at once, but in its ability to break down fuzzy goals into executable, verifiable, and rollback-able engineering plans. A more rational workflow includes:

    1. Planning Phase: A model with strong planning capabilities outputs requirement boundaries, architecture drafts, module lists, interface contracts, milestones, acceptance cases, and risk lists.
    2. Consolidation Phase: Save the planning results as local structured documents to form the factual basis for subsequent execution, preventing goal drift across multiple conversation rounds.
    3. Execution Phase: A cheaper execution model codes according to the documentation. Local rework is performed after manual or automated acceptance.
    4. Review Phase: Record defect density, rework rate, quota consumption, and acceptance pass rate to form a reusable evaluation baseline.

    The schematic workflow is as follows:

    1. Goal Description -> Planning Model -> Planning Document -> Human Review -> Execution Model -> Prototype Artifact
    2. -> Acceptance Checklist -> Local Fix -> Cost and Quality Record

    This separation offers three benefits: first, the planning document is auditable, making it easy to locate whether an error occurred in planning or execution; second, the execution model can be replaced, making costs more controllable; third, complex tasks are broken into short chains, reducing quota waste caused by long-context repetitive fixes. Evaluation metrics should also upgrade from “can it generate” to six dimensions: “planning completeness, executability, defect density, rework count, visual quality, and total cost.”

    2. Task 1: Planning and Boundary Limits of a Spreadsheet Prototype

    A spreadsheet may seem simple, but it actually contains multiple subsystems: data models, formula calculations, cell rendering, keyboard interaction, selection management, undo/redo, import/export, and performance optimization. Real commercial products can have millions of lines of code. While a prototype doesn’t need to match this complexity, it must possess a demonstrable core loop: data entry, selection, formulas, recalculation, display, and basic interaction.

    The planning document should cover at least:

    • Requirement Boundaries: Supported cell types, formula ranges, and interactive operations, clearly defining what is out of scope.
    • Data Contracts: Data structures for workbooks, worksheets, cells, styles, and formula expressions.
    • Module Splitting: Calculation engine, rendering layer, interaction layer, command history, and file I/O.
    • Acceptance Cases: Formula dependency recalculation, circular reference prompts, range selection, undo/redo, and exception handling.
    • Risk List: Performance bottlenecks, formula parsing complexity, rendering consistency, and edge cases.

    It is worth emphasizing that simple spreadsheet prototypes have long been difficult for some open-source models to achieve, indicating that the difficulty lies not in page layout, but in “whether the planning covers the coupling relationship between calculation and interaction.” If a planning model only provides a list of page components, the execution phase will inevitably face repetitive rework. If it can proactively define the formula dependency graph, recalculation order, and command patterns, execution quality will significantly improve.

    The conclusion is that, given a sufficient budget, a planning model can generate a highly complete demonstration prototype, but this cannot be equated with a production-grade spreadsheet. It can probe the upper limits of planning capabilities but cannot replace the architectural review, performance testing, and security hardening of an engineering team.

    3. Task 2: Aesthetic Capabilities in Script Painting and Scene Beautification

    The second task leans more towards the combination of visuals and algorithms: using scripts to draw scenes with a massive number of brushstrokes, and improving realism through layering, color grading, lighting, and noise control. The original case used hundreds of thousands of brushstrokes to paint an almost photorealistic image, demonstrating the model’s potential to translate “aesthetic goals” into “drawing strategies.” The practical test can be adapted to generate 2D side-scrolling action game scenes, requiring consistency in composition, color, layering, and atmosphere.

    Evaluation focuses include:

    • Semantic Consistency: Whether scene elements match the description and the relationship between foreground and background is logical.
    • Visual Quality: Whether brushstroke density, color transitions, lighting direction, and detail noise are natural.
    • Controllability: Whether hue, density, resolution, and local repainting can be adjusted via parameters.
    • Performance and Cost: Whether the number of brushstrokes, rendering time, and iteration count are controllable.

    A more robust approach is to let the planning model first generate “composition plans, color palettes, layering strategies, brushstroke parameters, and local retry rules,” and then have the execution model implement the drawing script. This way, even if the visual result is imperfect, costs can be controlled through local retries and parameter rollbacks, rather than generating an uncontrollable large image in one shot.

    4. Quota Consumption and Cost Control

    The fact that two tasks exhausted the monthly quota indicates that the main costs of complex prototypes stem from long contexts, multi-round fixes, code growth, and visual iteration. Cost control should follow these principles:

    1. Staged Budgeting: Set thresholds for planning, execution, and fixing separately. Stop and review if limits are exceeded.
    2. Planning Caching: Consolidate the planning document once and reuse it multiple times to avoid redundant inference.
    3. Local Retries: Only regenerate failed modules instead of rerunning the entire project.
    4. Upfront Acceptance: Write the acceptance checklist first, then have the execution model code to reduce ineffective rework.
    5. Artifact Reuse: Components, styles, test cases, and scene parameters should be versioned and saved.

    5. Risks and Engineering Recommendations

    Planning models can still suffer from “planning hallucinations,” such as omitting key modules or underestimating complexity. Engineering implementation should retain human review, automated testing, permission isolation, and artifact auditing. If relying on a general cloud environment, planning documents, code artifacts, and runtime logs can be stored separately in object storage, container platforms, and log services for easy tracking and rollback.

    Overall, a planning LLM acts more like a “combination of an architect and a project manager.” Its true value lies in lowering the trial-and-error costs of complex tasks, not replacing development with a single click. That two tasks exhausted the monthly quota is not surprising; it reminds teams that complex software prototype evaluation must measure planning quality, execution costs, and acceptance standards within the same framework.