Smart O&M and Informatization Practices for Main-Stem Hydraulic Projects and Ecological Water Delivery in an Inland River Basin

    This article examines the challenges and practices of smart operations and maintenance (O&M) and informatized ecological water delivery in a long-distance inland river basin. It describes a three-part approach: a classified project asset ledger and routine/project-based O&M; a networked sensing and monitoring system covering video surveillance, groundwater monitoring, and ecological monitoring wells; and an LLM-based knowledge base plus quantified ecological benefit evaluation. It concludes with practical lessons on building asset ledgers before informatization, sustaining sensing-network maintenance, closing the data loop for scheduling decisions, and turning dispersed knowledge into interactive organizational assets. Readers gain a structured view of how long-distance main-stem hydraulic projects can move from manual, experience-based management toward quantified and intelligent operations.

    Smart O&M and Informatization Practices for Main-Stem Hydraulic Projects and Ecological Water Delivery in an Inland River Basin

    1. Background and Problem Statement

    Northwest China contains several typical inland rivers. Their main stems have long water-delivery distances, and the ecological environment along the routes is fragile. The construction, operation, and maintenance of hydraulic projects therefore face special challenges. Taking a large inland river basin as an example, its main stem runs from an upstream hydrological cross-section to the terminal lake downstream, with a total length of more than 1,300 km. Reservoirs, diversion hubs, canals, intake gates, and other facilities are distributed along the route. For a basin management agency, such long-distance, multi-node, and cross-administrative management objects make traditional manual patrols, paper ledgers, and experience-based scheduling insufficient for refined management.

    The core contradictions in this context can be summarized in three points. First, the management area is extensive while O&M resources are limited; dozens of facilities along the 1,321 km main stem cannot be covered by high-frequency manual inspections. Second, the benefits of ecological water delivery lack quantitative measurement; the restoration of natural vegetation such as Populus euphratica forests requires long-term, continuous, and comparable data. Third, scheduling decisions depend heavily on historical experience, and the efficiency of knowledge accumulation and reuse is low. To address these contradictions, basin management agencies of this type have gradually explored a smart-water practice path combining “systematic project O&M + networked sensing and monitoring + intelligent scheduling decisions.” This article provides a systematic review of that path.

    2. Main-Stem Project O&M Management System

    2.1 Classified Project Asset Ledger

    The first step in long-distance main-stem management is to establish a clear project asset ledger and implement classified management. A typical main-stem project system includes:

    • Regulating projects: plain reservoirs, which provide regulation for irrigation and ecological water supply;
    • Control hubs: diversion hubs and barrage hubs, which redistribute main-stem water volume in time and space;
    • Water abstraction and distribution projects: diversion gates, intake gates, and canals, which convey main-stem water to irrigation districts and ecological water-demand areas.

    For each project category, a uniformly coded asset ledger should be established, specifying design indicators, O&M cycles, responsible persons, and safety levels. This forms the management foundation of “one file per gate, one file per station.” It is not only the basis for daily O&M but also the data foundation for subsequent informatization system construction.

    2.2 Routine O&M and Project-Based Management

    Project O&M is usually implemented on an annual rolling basis, including inspection and maintenance of hydraulic structures, maintenance of gate hoist equipment, canal dredging, and maintenance of informatization equipment. In terms of funding management, self-funded investment projects generally need to follow required procedures such as survey and design, tendering, and procurement. Public tendering can be carried out through the relevant local electronic procurement platform to ensure process compliance and cost control. O&M budgets are often prepared by referring to a certain proportion of the total investment in construction and installation works and are dynamically adjusted according to the project’s operating years and health condition.

    3. Informatized Sensing and Monitoring Network

    3.1 Video Surveillance Network

    For dispersed and remote project nodes, deploying video surveillance stations is a key means of improving inspection efficiency. Taking the main stem of a basin as an example, its informatization maintenance project covers inspection and maintenance of 126 video surveillance stations along the route. The value of the video surveillance network lies in the following:

    1. Remote inspection replaces part of manual patrols, significantly reducing long-distance travel costs;
    2. Real-time monitoring during flood seasons and water-delivery periods, providing first-hand visual information for gate scheduling and risk warning;
    3. Playback capability of recorded video, supporting incident review and responsibility determination.

    At the O&M level, a maintenance mechanism of “monthly inspection + fault response + quarterly assessment” should be established, with emphasis on availability metrics for power supply, transmission links, and camera equipment.

    3.2 Groundwater Level and Ecological Monitoring Wells

    One of the core assessment indicators for ecological water delivery is the change in groundwater levels along the route. The monitoring-well network is used to characterize the dynamics of groundwater depth on both sides of the main stem and to provide a basis for vegetation response analysis. Taking a typical project as an example, routine maintenance of 96 ecological monitoring wells ensures data continuity. After collection, monitoring-well data are aggregated through IoT channels to the basin data platform and fused with data from hydrological and meteorological stations to form an integrated “surface–subsurface–vegetation” ecological water-regime dataset.

    4. Intelligent Knowledge Base and Ecological Benefit Evaluation

    4.1 Knowledge Base Intelligent Interaction System

    Since 2022, relevant basin agencies have worked with research institutions to explore a water-knowledge-base intelligent interaction system based on large language model (LLM) technology. Its typical architecture has three layers:

    1. ┌─────────────────────────────────┐
    2. │ Interaction layer: natural-language Q&A, report-assisted generation │
    3. ├─────────────────────────────────┤
    4. │ Knowledge layer: regulatory documents, scheduling procedures, historical plans, │
    5. │ knowledge organization of monitoring data (retrieval augmentation) │
    6. ├─────────────────────────────────┤
    7. │ Data layer: project ledger, hydrological series, remote-sensing imagery, │
    8. │ groundwater-level and vegetation monitoring data │
    9. └─────────────────────────────────┘

    The core capability of this system is to uniformly organize knowledge scattered across documents, databases, and expert experience. Scheduling and management personnel can use natural language to complete queries such as “outflow statistics for a hub during the water-delivery period over the past three years,” greatly lowering the threshold for information access.

    4.2 Quantified Evaluation of Ecological Water-Delivery Benefits

    With data support, the benefits of ecological water delivery can be expressed quantitatively. Typical evaluation dimensions include outflow water volume during the water-delivery period, groundwater-level rise amplitude on both sides of the river channel, and changes in flood-irrigated area and coverage of natural vegetation. Taking actual results in a given year as an example, after ecological water replenishment, the flood-irrigated area of Populus euphratica forests along the route reached 2.72 million mu, and vegetation coverage increased by 4.3%. Such quantitative conclusions not only verify the effectiveness of the water-delivery scheme but also provide a decision basis for optimizing water-delivery timing and intensity in the following year.

    5. Practical Implications

    Based on the above practices, four lessons can be drawn for similar basin management agencies:

    1. Asset ledger first, informatization second: sensing networks and intelligent systems must be built on a clear project asset ledger; otherwise, data cannot be mapped to physical projects.
    2. Sensing networks require sustained maintenance: the long-term availability of video surveillance stations and monitoring wells is more important than the initial construction scale, and maintenance funds should be included in annual project-based budgets.
    3. Closed-loop data drives decisions: from monitoring data to benefit evaluation and then to scheduling-scheme optimization, a complete closed loop allows ecological water delivery to move from experience-based to quantified management.
    4. Intelligent knowledge accumulation: with knowledge bases and retrieval-augmentation technology, dispersed regulations, plans, and expert experience can be transformed into interactive organizational assets.

    For the construction of an informatization foundation, basin agencies can use general cloud-computing capabilities—such as object storage, message queues, container platforms, and monitoring and alerting service categories—to build an elastic and scalable data platform. While ensuring data security, they can steadily advance smart water management and ultimately achieve efficient project O&M, scientific ecological scheduling, and intelligent management decisions.