Mobile Development Agent Benchmark Update: How to Read the Scores and Costs

    This article reviews a recent update to a mobile development agent benchmark, where evaluation has shifted from short single-file tasks toward long-horizon work that can run for hours. It explains how to read the four key metrics—pass rate, average completion, average elapsed time, and cost per benchmark run—and what each one actually measures, then uses two representative agents (Agent A and Agent B) to show the nonlinear relationship between capability and cost. It also offers a way to position solutions on a capability–cost map, breaks down why mobile long-horizon tasks are difficult, outlines practical optimization strategies such as hybrid routing and milestone-based validation, and provides a guide for building your own evaluation set. The takeaway: use leaderboards as a ruler, not a verdict, and make selection decisions from your own test data.

    1. The leaderboard update: long-horizon coding agents enter a new phase

    Large-model-assisted programming is moving from “completing code snippets” to “finishing whole tasks on their own.” In code benchmarks, tasks that can be closed out quickly—single-file completion, implementing a single function—have largely become table stakes. Scores are saturating, and these tasks no longer separate strong agents from weak ones. As a result, the center of gravity is shifting to long-horizon tasks: agents must work continuously for hours or even tens of hours, autonomously understand requirements, search the codebase, plan implementation steps, modify multiple files, run builds and tests, self-correct based on errors, and keep going until they meet the acceptance criteria.

    Mobile application development is a representative test of this capability. Such projects are usually assembled from multiple modules, carry several build variants, take a long time to compile, and often need an emulator or a physical device to verify behavior. Meanwhile, defects like dependency-version conflicts, misconfigured resources, and multithreading and lifecycle issues are subtle and common. To complete a full requirement, an agent needs a combination of skills: code comprehension, engineering builds, test verification, and error recovery.

    That is exactly why each update to a mobile development agent leaderboard draws attention from engineering teams. The highlights of this update:

    1. Two new agents were added to a set of 30 long-horizon tasks, each representing a distinct product direction at this stage.
    2. The top scorer cost as much as $317.4 per benchmark run (roughly ¥2,123), which widened the leaderboard’s cost range considerably.
    3. Some participants made clear gains in pass rate but now sit at different points on the capability–cost curve.

    For discussion, this article refers to the two as Agent A and Agent B. They run on different execution frameworks: A runs on a proprietary coding-agent tool, while B runs on a third-party open-source agent framework. This shows that long-horizon results depend not on the underlying model alone, but on the combination of “model capability + execution framework.” It is also worth stressing that Agent A and Agent B come from the same developer.

    Core data disclosed in this update

    Metric Agent A Agent B Current leader
    Pass rate 24.0% 17.3% 28.7%
    Average completion 82.3% 71.2% Not disclosed
    Average elapsed time 27.4 hours 12.0 hours Not disclosed
    Cost per benchmark run $317.4 (roughly ¥2,123) $9.9 (roughly ¥66.2) Not disclosed

    Overall, three conclusions stand out:

    1. Capability and cost have a nonlinear relationship. B’s pass rate is 6.7 percentage points lower than A’s, yet its cost per run is only about 1/32 of A’s. Moving from B up to A improves pass rate by roughly 1.39x, but cost grows by roughly 31x.
    2. Speed is the other pillar of a low-budget approach. A’s average elapsed time is 27.4 hours—more than 2.3x B’s. For teams that schedule by project cycle and need fast trial-and-error, a several-fold gap in time often affects development rhythm more than a few percentage points of pass rate.
    3. High completion does not mean it can ship. Average completion is 82.3% and 71.2% respectively, which looks like “most of the task is basically done,” yet both fall short of a 30% pass rate.

    2. Reading the metrics: the real definition behind four numbers

    2.1 Pass rate: the strictest outcome metric

    Pass rate reflects the share of tasks an agent “actually completed,” usually judged by objective criteria such as an automated test suite. An agent’s submitted changes either pass all acceptance checks or they do not. Its limitation is that it is all-or-nothing: a solution that implements almost everything but misses one boundary condition may be recorded the same as one that did almost nothing—“not passed.”

    Before interpreting pass rate, confirm four things:

    1. Task source. Are the problems drawn from real repositories, human-reviewed, and stated without ambiguity?
    2. Judgment method. Is it a test suite, a build/compile step, or human review?
    3. Timeout handling. Are timeouts, crashes, and voluntary give-ups all counted as failures?
    4. Number of attempts. How many retries are allowed, and is it scored under a “pass at least once” (pass@k) convention?

    Different definitions make numbers incomparable.

    2.2 Average completion: a process metric that reflects progress

    Average completion measures how far a task was advanced. It is usually computed from checkpoints after task decomposition, coverage of code changes, or partial scoring by the evaluator, and it allows partial credit. It is useful for observing an agent’s steady progress on long tasks and for warning “this may not get finished” during execution.

    But there is typically a clear gap between completion and pass rate:

    • Agent A: 82.3% − 24.0% = 58.3 percentage points;
    • Agent B: 71.2% − 17.3% = 53.9 percentage points.

    Both gaps are around 54 points, a ratio of about 3.4x and 4.1x respectively, which shows that completion has limited power to predict outcomes. A straightforward explanation: in mobile projects, “scaffolding” work like laying out screens and writing basic logic is easy to advance and carries a large share of the score. Meanwhile, hard parts like concurrency handling, lifecycle management, and complex state transitions often carry few points but decide whether acceptance passes. An agent may finish most of the easy parts and still get stuck on the few critical “final inches.”

    So completion should be positioned as a process metric: use it to judge whether a task is worth continued investment or whether human intervention is needed early—not as a delivery verdict.

    2.3 Average elapsed time: the real burden of long-horizon tasks

    27.4 hours versus 12.0 hours means that even the “faster” participant needs more than half a day to finish one round of the task set. Time on long-horizon tasks comes not only from model inference, but also from waiting on tool calls—code search, compilation, test execution—and from retries and rollbacks after failures.

    For engineering teams, this implies three things:

    1. You need resume-from-checkpoint capability, so an environment interruption does not waste all the work.
    2. You need context management, or the agent may “forget” the original constraints as the task reaches its later stages.
    3. You need clear timeouts and budget caps to prevent individual tasks from consuming resources without limit.

    2.4 Cost per benchmark run: unify the definition before discussing cost-effectiveness

    Cost per benchmark run converts one full evaluation round into money. It is convenient for comparison but also the easiest to misread, for three reasons:

    1. Unclear definition. “Per benchmark run” may mean the average cost of a single task, or the total cost of running the entire task set—these can differ by about 30x.
    2. Exchange-rate fluctuation. $317.4 is roughly ¥2,123 and $9.9 is roughly ¥66.2, implying an exchange rate of about 6.69. Rate changes directly affect CNY-denominated results.
    3. Hidden costs. Beyond the bill, there are sandbox environments, compute for builds, storage and logs, plus the labor cost of human review and rework.

    Extrapolating from the leaderboard’s data: Agent A costs about $1,322 per passed task, and Agent B about $57—roughly a 23x difference. Whichever definition you use, the “pass-rate ratio” is far smaller than the “cost ratio,” which is a vivid illustration of the “cost-effectiveness inflection point” in long-horizon tasks.

    3. Positioning: finding your place on the capability–cost map

    Looking at a single metric is misleading; placing multiple metrics on the same coordinate system reveals where each option stands.

    • Agent A: mid-to-high-end, balanced cost-effectiveness. Its 24.0% pass rate is higher than in-leaderboard models such as GPT 6 Astra, Claude Fable 5.1, and Gemini 4 Argon, and close to the 28.7% leader. For teams with more complex tasks that are willing to spend a bit more for a higher success rate, it can serve as a primary executor.
    • Agent B: lightweight and fast. Its 17.3% pass rate is below Agent A’s and further below the leader’s, but it averages 12.0 hours and $9.9 per run. It is especially suited to budget-constrained teams that want fast feedback—for example, high-frequency iteration on business features, bulk boilerplate generation, and initial problem triage.
    • The leader: a capability ceiling. A 28.7% pass rate shows it still holds an edge on complex tasks. If error tolerance is low and human rework is costly, the extra spend may be worthwhile.

    A simplified model can quantify this trade-off:

    Cost per effective output = cost per run ÷ pass rate
    Effective task throughput = pass rate × number of tasks ÷ average elapsed time

    The first measures “how much it costs to deliver one task that passes acceptance”; the second measures “how many qualifying tasks can be delivered per unit of time.” Teams can adjust the weights based on their own labor costs and project timelines, turning selection from “pick whoever scores highest” into “pick whoever best fits the constraints.”

    But the data has boundaries:

    1. The leader’s completion, elapsed time, and cost are undisclosed, so a full four-dimension comparison is impossible.
    2. With a sample of 30 tasks, sampling variance in pass rate is significant.
    3. Leaderboard results do not equal performance on your own codebase.

    So the rational approach is: “use the leaderboard to set direction, use your own tests to make decisions.”

    4. Capability breakdown: what makes mobile long-horizon tasks hard

    Understanding the difficulties helps you optimize agents in a targeted way. The challenges of mobile long-horizon tasks fall into five categories.

    1. Requirement-understanding drift. Requirements are often described in natural language with many implicit interaction details and boundary conditions. Misunderstandings get amplified over a long task and only surface at acceptance time.
    2. Large-codebase navigation. Agents must locate relevant modules, understand call relationships, and judge the blast radius of a change. Editing the wrong place sends every subsequent step off course.
    3. Environment dependencies and build complexity. Dependency-version conflicts, build-script configuration, and emulator or device environments can all become roadblocks. An agent may burn through time and budget repeatedly trial-and-erroring on environment problems.
    4. Closing the verification loop. Compiling successfully does not mean the feature is correct. Without automatically runnable tests, an agent struggles to judge whether it truly finished the task.
    5. Error recovery and context management. Errors are inevitable in long tasks. Whether the agent can accurately attribute causes, roll back bad changes, and learn from failures directly decides whether the task “keeps moving forward” or “spins in place.”

    This also partly explains the gap between high completion and low pass rate: agents are good at quickly assembling an implementation that “looks right,” but struggle to reliably clear the two thresholds of the verification loop and boundary details.

    5. Optimization ideas: making long-horizon tasks more controllable and economical

    5.1 Use “hybrid routing” to balance cost and quality

    Borrowing a classic idea from speech recognition: first produce an initial result with a lightweight model, then use a confidence signal to decide whether to escalate to a heavier model. Long-horizon coding tasks fit the same pattern:

    • A low-cost agent handles first-pass implementation, routine feature work, and code explanation;
    • When a build fails, tests fail, or complexity exceeds a threshold, escalate to a higher-capability agent to review and fix.

    Illustrative code:

    1. def execute_with_routing(task, light_agent, strong_agent, max_escalations=1):
    2. # Phase 1: the low-cost agent produces the first implementation
    3. draft = light_agent.run(task)
    4. # Small-step validation: surface problems early at minimal cost
    5. check = quick_validate(draft)
    6. if check.passed:
    7. return draft
    8. # Phase 2: escalate on demand; cap escalations to control cost
    9. for _ in range(max_escalations):
    10. fix = strong_agent.fix(task, draft, check.errors)
    11. check = quick_validate(fix)
    12. if check.passed:
    13. return fix
    14. draft, check = fix, check
    15. # Still failing at the end: hand off to a human to avoid wasted spend
    16. return escalate_to_human(task, draft, check.errors)

    5.2 Break long-horizon tasks into milestones with small-step validation

    Rather than letting an agent run a single long task straight to the end, split the requirement into several independently verifiable milestones—for example: data model definitions, API implementation, UI construction, and interaction wiring. Give each milestone an automatically runnable check, such as compile, unit tests, and static analysis. The benefits are threefold:

    1. Surface deviations early and prevent error accumulation;
    2. Provide a completion measure that better reflects real progress;
    3. On failure, roll back one milestone rather than all the work.

    5.3 Control context and “memory”

    1. Structured engineering knowledge. Capture architecture conventions, directory layout, and coding standards as engineering documents the agent can read continuously, instead of long conversation histories.
    2. Execution logs and intermediate artifacts. Write execution logs, build output, and test reports to persistent storage for the agent to retrieve on demand, rather than stuffing everything into the context at once.
    3. Long-task experience retention. Archive past runs into a “failure mode → solution” knowledge base. When a new task starts, retrieve similar cases first to reduce repeated pitfalls.

    5.4 Ensure runtime isolation and access control

    1. Agents should run in isolated sandboxes with read/write permissions granted on demand; code must pass human or automated review before it is committed.
    2. Apply least-privilege to steps involving sensitive data such as build artifacts and secrets; sensitive operations require explicit authorization.
    3. If code or data cannot leave the internal network, consider privately deployed open-source models or agent frameworks.

    5.5 Bring runtime data into an observability system

    Using log services and monitoring/alerting, continuously collect each task’s start/end times, per-phase durations, model call volume, tool call counts, and failure reasons, aggregated by dimensions such as task type, model, and execution framework. With this data you can answer three key questions: where is the time going, where is the cost going, and where are failures concentrated? From there you can adjust context, upgrade the execution framework, or swap the underlying model with purpose.

    6. Practical guide: building your team’s own long-horizon evaluation set

    6.1 Task design

    1. Real sources. Pick historical requirements, bug fixes, and refactoring tasks from real repositories, prioritizing tasks with clear existing tests and well-defined requirement boundaries.
    2. Difficulty tiers. Cover multiple levels: single-module small changes, cross-module feature work, bug localization and fixes, and refactoring and performance optimization.
    3. Moderate scale. Referencing the leaderboard’s 30 tasks, 15–30 items are enough to cover the main scenarios while controlling evaluation cost.
    4. Objective acceptance. Give each task an automatically runnable acceptance script to avoid subjective judgment.

    6.2 Execution environment

    1. Container isolation. Run each task in its own container to guarantee reproducible, non-interfering environments.
    2. Pre-installed dependencies. Pull dependencies and pre-install build tools in advance so the agent does not waste time on downloads and installs.
    3. Network control. Restrict external network access during evaluation to prevent the agent from looking up ready-made answers and skewing results.
    4. Resource limits. Use container platform resource limits, task queues, and timeouts to prevent a single task from consuming too many resources.

    6.3 Metric definitions

    Metric definitions must be unified within the team and written into documentation:

    Metric Suggested definition Notes
    Pass rate Tasks passing all acceptance checks ÷ total tasks Define whether timeouts, crashes, and give-ups count as failures
    Average completion Mean of each task’s checkpoint completion ratio Checkpoints must map to acceptance criteria; weights set in advance
    Average elapsed time Mean wall-clock time from task dispatch to acceptance verdict Include tool-execution time such as compile and test
    Cost per run Sum of model-call and resource costs for one full evaluation round Specify whether it includes retries and human intervention

    6.4 Evaluation execution framework (illustrative)

    1. from dataclasses import dataclass
    2. from statistics import mean
    3. @dataclass
    4. class TaskResult:
    5. task_id: str
    6. passed: bool # whether all acceptance checks passed
    7. completion: float # fraction of checkpoints completed, 0~1
    8. elapsed_hours: float # wall-clock time
    9. cost_usd: float # includes model calls and resource usage
    10. attempts: int = 1 # number of attempts, including failed retries
    11. def run_eval(agent, tasks, sandbox, max_attempts=3):
    12. results = []
    13. for task in tasks:
    14. env = sandbox.create() # create an isolated environment per task
    15. try:
    16. result = agent.solve(task, env, max_attempts=max_attempts)
    17. report = task.verify(env) # run the preset acceptance script
    18. results.append(TaskResult(
    19. task_id=task.id,
    20. passed=report.all_passed,
    21. completion=report.completed_checks / report.total_checks,
    22. elapsed_hours=result.elapsed_hours,
    23. cost_usd=result.token_cost + result.compute_cost,
    24. attempts=result.attempts,
    25. ))
    26. finally:
    27. sandbox.cleanup(env) # release the environment regardless of outcome
    28. n = len(results)
    29. passed = sum(r.passed for r in results)
    30. return {
    31. "pass_rate": passed / n,
    32. "avg_completion": mean(r.completion for r in results),
    33. "avg_elapsed_hours": mean(r.elapsed_hours for r in results),
    34. "total_cost_usd": sum(r.cost_usd for r in results),
    35. "cost_per_passed_task": (sum(r.cost_usd for r in results) / passed) if passed else None,
    36. # retry distribution helps identify tasks with repeated trial-and-error
    37. "retry_histogram": {k: sum(r.attempts == k for r in results)
    38. for k in range(1, max_attempts + 1)},
    39. }

    6.5 Interpreting results

    1. Repeat multiple times. Run at least 3–5 rounds per configuration and describe stability with mean and standard deviation. When outliers appear, investigate with execution logs.
    2. Break down by difficulty tier. Report pass rate and cost per difficulty tier so overall averages do not hide weak spots.
    3. Separate failure stages. Record whether failures occur in requirement analysis, code implementation, build/compilation, functional verification, or boundary handling, and use that to locate improvement areas.
    4. Low-cost trials. You can run evaluations in on-demand cloud containers first. Object storage can hold task definitions and execution logs, task queues handle scheduling, and compute is consumed only when tasks actually run—lowering the cost of a self-built setup.

    7. Common pitfalls and best practices

    Common pitfall Better practice
    Treating completion as pass rate Use completion only for process monitoring; deliver based on acceptance results
    Looking only at pass rate Weigh pass rate, elapsed time, and cost together; make trade-offs per scenario constraints
    Blindly upgrading to a higher-capability option Validate with hybrid routing first; assess ROI by escalation trigger rate
    Fixed, uncontrolled evaluation environment Use container isolation, pre-installed dependencies, and recorded environment info
    Counting only model-call fees Include environment, build, storage, and labor costs in the accounting

    8. Conclusion

    This leaderboard update sends a clear signal: mobile development agents are moving from “can it be done” to “at what cost can it be done.”

    • Agent A, with a 24.0% pass rate and a 27.4-hour average, comes close to the 28.7% leader.
    • Agent B, with a $9.9 cost per run and a 12.0-hour average, offers a viable option for budget- and schedule-sensitive teams.

    Behind the two are same-developer products built on different execution frameworks, which shows that the co-design of “model + framework” is becoming key to long-horizon capability competition. For engineering teams, what truly matters is not a leaderboard rank but treating the leaderboard as a ruler: combine your own task difficulty, delivery cycle, and budget constraints, build your own evaluation set, and let data drive selection and tuning. Baidu AI Cloud offers general-purpose cloud capabilities such as container platforms, object storage, log services, and monitoring/alerting, which can serve as an optional foundation for teams building evaluation and runtime environments.